info@datacenterresources.com | 866.740.2121 | Contact Us
cropped-DCR-Transparent-Logo-2.png
  • Cooling
    Optimization
    • Aisle Containment
    • CRAC Hoods
    • Koldlok Floor Grommets
    • High Flow Floor Tiles
    • Ceiling Grid Fan Tray
    • Barrier Panels
    • Blanking Panels
    • Foam Gap Seal
    • Magnetic Cabinet Skirts
  • Aisle
    Containment
    • Aisle Containment Panels
    • Aisle Containment Doors
    • Aisle Containment Flexible Strip Curtains
    • Cool Shield Structure
  • Power
    Management
    • Rack Power Distribution
      • Enconnex PDUs
      • Enconnex Rack Mount PDUs
      • Upsite PowerLok PDUs
    • UPS Systems
      • Rack UPS
      • Scalable UPS
    • Cords and Cables
      • Server Cables & Cords
      • PDU Cables
  • Data Center
    Monitoring
    • Temperature Monitoring
    • Airflow Monitoring
    • Battery Monitoring
  • Server Rack
    Infrastructure
    • Enterprise Server Cabinets
    • Air Conditioned Enclosures
    • RF Shielded Cabinets
    • Data Center Cages
  • Data Center
    Flooring
    • New Access Floor Tiles
    • Replacement Access Floor Tiles
    • Clear Access Floor Tiles
    • Access Floor Tile Accessories
    • Fan Powered Floor Tiles
  • Modular
    Infrastructure
    • Modular Data Center Blocks
    • Edge Aisle Data Center
  • Control Room
    Furniture
    • Command Watch Consoles
    • Command Flex Consoles
    • Control Room Design Services
    • Control Room Installation Services
    • Custom Millwork
    • Control Room Accessories
    • 24/7 Operator Chairs
    • Sanitary Safety Dividers
  • Cooling
    Optimization
    • Aisle Containment
    • CRAC Hoods
    • Koldlok Floor Grommets
    • High Flow Floor Tiles
    • Ceiling Grid Fan Tray
    • Barrier Panels
    • Blanking Panels
    • Foam Gap Seal
    • Magnetic Cabinet Skirts
  • Aisle
    Containment
    • Aisle Containment Panels
    • Aisle Containment Doors
    • Aisle Containment Flexible Strip Curtains
    • Cool Shield Structure
  • Power
    Management
    • Rack Power Distribution
      • Enconnex PDUs
      • Enconnex Rack Mount PDUs
      • Upsite PowerLok PDUs
    • UPS Systems
      • Rack UPS
      • Scalable UPS
    • Cords and Cables
      • Server Cables & Cords
      • PDU Cables
  • Data Center
    Monitoring
    • Temperature Monitoring
    • Airflow Monitoring
    • Battery Monitoring
  • Server Rack
    Infrastructure
    • Enterprise Server Cabinets
    • Air Conditioned Enclosures
    • RF Shielded Cabinets
    • Data Center Cages
  • Data Center
    Flooring
    • New Access Floor Tiles
    • Replacement Access Floor Tiles
    • Clear Access Floor Tiles
    • Access Floor Tile Accessories
    • Fan Powered Floor Tiles
  • Modular
    Infrastructure
    • Modular Data Center Blocks
    • Edge Aisle Data Center
  • Control Room
    Furniture
    • Command Watch Consoles
    • Command Flex Consoles
    • Control Room Design Services
    • Control Room Installation Services
    • Custom Millwork
    • Control Room Accessories
    • 24/7 Operator Chairs
    • Sanitary Safety Dividers

Home » White Paper » The Vector Approach to Data Center Power Planning

The Vector Approach to Data Center Power Planning

Many data centers, including most of those built before 2001, are at risk of outstripping their capacity to power and cool their IT systems. Already, data centers consume 10–30 times more energy per square foot than the typical office building—a figure that has doubled in the last five years. Energy costs represent the single largest component of operating expense, and a potential barrier to future expansion.

Does IT really have a handle on this trend? More regularly and frequently, organizations are hitting fixed limits in their power systems—even systems that were designed and deployed fairly recently. With the volatile rate of change in IT technologies, power demands can quickly exceed established barriers in a legacy distribution system, such as the performance potential of existing amperage/voltage ratings, UPSs, cabling and connectors. The cost of upgrading, augmenting or replacing the power architecture can be astronomical.

The costs often could have been minimized or avoided if the power planning process had simply been more forward‐looking and holistic in the first place. This white paper describes an approach that considers the major milestones and thresholds in data center power requirements—and how planners should adjust their strategies and recommendations for data centers as they pass through different evolutionary stages.

If you don’t want to get caught short, click to read on.

pdfIcon

The Vector Approach to Data Center Power Planning

PrevPreviousImproving data center efficiency and capacity with aisle containment

Phone (Toll Free)
866-740-2121

Fax (Toll Free)
866-550-1135

Email
dcrinfo@datacenterresources.com

New York Office – Corporate Headquarters
Data Center Resources, LLC
78 John Glenn Drive
Amherst, New York 14228







    Recent Posts

    Data Center Server Room Design

    5 Best Practices for Server Room Design

    Your data center, or server room, is in many ways the very heart of your

    Read More »

    Advantages of a Two-Tier Data Center

    Advantages of a Two Tier Data Center Data center tier standards refer to a categorization

    Read More »
    Hot Aisle Containment Image

    Hot Aisle Containment or Cold Aisle Containment

    Certain vendor white papers tout the advantages of hot aisle containment. Other vendors claim that

    Read More »

    About Us

    Data Center Resources, LLC
    78 John Glenn Drive Amherst, New York 14228

    Phone (Toll Free) 866-740-2121
    Fax (Toll Free) 866-550-1135

    Email info@datacenterresources.com

    PRODUCTS

    • Cooling Optimization
    • Aisle Containment
    • Power Management
    • Data Center Monitoring
    • Server Rack Infrastructure
    • Data Center Flooring
    • Modular Infrastructure
    • NOC Console Furniture
    • Cooling Optimization
    • Aisle Containment
    • Power Management
    • Data Center Monitoring
    • Server Rack Infrastructure
    • Data Center Flooring
    • Modular Infrastructure
    • NOC Console Furniture

    Support

    • Services
    • News
    • About Us
    • Careers
    • Contact Us
    • Services
    • News
    • About Us
    • Careers
    • Contact Us

    Contact

    Ⓒ 2021 Data Center Resources LLC.